Trail Maintenance at Six Mile Run: 2 New Bridges

 

Trail Maintenance Six Mile Run Franklin Township New Jersey

Jorba’s April Trail Day at Six Mile Run was successful. About 25 people came out for a hot day in the sun. We built a bridge, rerouted some trail, trimmed some pricker bushes and put in a 30′ length of rollercoaster decking. Thanks to everyone that came out and made the day a success.

Photography ©2009 Jason King Photography Princeton, NJ

 
 
 

Leave a Reply

follow_us_on twitter facebook
 
footer Cannondale Seven Cycles Niner Bikes Haro Quintana Roo Electra Thule Racks Giant Bicycles Easton Bike Salsa Bicycle Chris King Precision Components Fox Racing Shox Mavic Wipperman Connex Chains Michelin Bike Tires Oury Grips Continental Bicycle Tires JORBA SRAM Shimano Descente IMBA FSA Pearl Izumi Hutchinson Giordana Light Motion Zipp Oakley
 

Copyright © 2010-2011 Halter's Cycles

Entries (RSS) and Comments (RSS).

Jason King Studios | Web Design Princeton